Frame prep
With some help the rear wheel, front end and the engine and transmission
was removed. Now off to the car wash to remove 20 years of grease and oil
The Swing arm frame is stripped down for more cleaning and alignment of a
bracket for the crash bar and fuel tanks.
Sandblasted frame {thanks Nate} ready for some cleaning and new tabs for the fuel tanks.
Tanks mounts ready to be welded in place.
Frame primed and painted with basecoat black and cleared with polyurethane.